Setting Up the Board - 2022.1 English

Libmetal and OpenAMP User Guide (UG1186)

Document ID
UG1186
Release Date
2022-06-15
Version
2022.1 English

1. Connect the board to your computer, and ensure that it is powered on.

2. If the board is connected to a remote system, start the hw_server on the remote system.

3. Open a console terminal and connect it to UART (Universal Asynchronous Receiver/Transmitter) on the board.