Reports - 2022.1 English

Vivado Design Suite User Guide: Design Analysis and Closure Techniques (UG906)

Document ID
UG906
Release Date
2022-05-04
Version
2022.1 English

This chapter discusses various report types.

  • General Reports covers various netlist-based reports as well as power and DRC.
  • Timing Reports covers all the reports that are related to timing constraints.
  • Design Closure Reports covers reports that are used in the design closure phase. While these also contain timing and netlist-based analysis, there is a focus on how the two interact to cause timing closure challenges.