Description

Design Advisory, Versal ACAP, XPE – VCC_FUSE recommendation change

Release Date
2022-02-09

This Design Advisory covers Versal Devices.

For all Versal devices, VCC_FUSE should be powered up after the PMC domain is powered to prevent unintentional eFuse programming.

To minimize single event latch-up (SEL), VCC_FUSE must be connected to GND if not programming eFUSE.