This Design Advisory covers Versal Devices.
For all Versal devices, VCC_FUSE should be powered up after the PMC domain is powered to prevent unintentional eFuse programming.
To minimize single event latch-up (SEL), VCC_FUSE must be connected to GND if not programming eFUSE.