General Checks - 2.7 English

1G/10G/25G Switching Ethernet Subsystem Product Guide (PG292)

Document ID
PG292
Release Date
2023-10-18
Version
2.7 English

Ensure that all the timing constraints for the core were properly incorporated from the example design and that all constraints were met during implementation.

  • Does it work in post-place and route timing simulation? If problems are seen in hardware but not in timing simulation, this could indicate a PCB issue. Ensure that all clock sources are active and clean.
  • If using mixed-mode clock managers (MMCMs) in the design, ensure that all MMCMs have obtained lock by monitoring the LOCKED port.
  • If your outputs go to 0, check your licensing.