- Launch implementation of the first configuration. Select and
right-click impl_1 from the Design Runs
tab, and then click Launch Step To >
route_design.
Figure 1. Launch route_design for the First Configuration
- Click Open Implemented Design after implementation is complete. You can close the Synthesized design.
- Run the VIV DRCs for implementation. Open the Report DRC window and select
IDF_VIV2-5 and IDF_VIV2-6 from the Isolation group. Click
OK to run these DRCs.Figure 2. VIV DRCs for Implementation
You can see there are no warnings or errors in the DRC report. Advisories are reported as Violations in the report summary of the DRCs. This is common to all the DRCs and has nothing to do with the VIV DRCs. This is an issue with the way the error counts are reported and print the advisories without incrementing the error count.
- Inspect the files in
impl_1
directory under the Project Runs directory. You will see mb_dfx_controller_wrapper_routed_bb which is a a blackbox dcp and . - Close the implemented design. You can now proceed to the second configuration.